
Pipe and valves for engineering firms and skid manufacturers
We supply pipe, valves and fittings to process engineering firms, integrators and skid manufacturers, from hygienic stainless steel to special alloys.
With your specification reviewed before the order is placed.
We supply pipe, valves and fittings to process engineering firms, integrators and skid manufacturers, from hygienic stainless steel to special alloys.
With your specification reviewed before the order is placed.
What an engineering project needs from its material supplier
A skid manufacturer or integrator buys the pipe and valves for equipment it has to deliver to its client with the delivery date, specification and documentation package already fixed.
If the equipment falls under the Pressure Equipment Directive 2014/68/EU, the equipment manufacturer must obtain documentation from the manufacturer of each material certifying compliance with a specification and, for the main pressure-bearing parts of category II, III and IV equipment, a certificate of specific product control.
That is why we recommend finalising the material selection at the design stage, with engineering and purchasing working together.
A certificate missing from the documentation package or an item that arrives late will hold up delivery of the equipment to your client, even if the rest of the work is finished.
From hygienic tube to special alloys, from a single supplier
Specification review
We review your bill of materials before the order is placed and let you know if any item does not suit the process.
Hygienic and industrial
DIN and ASME BPE tube, ASTM pipe, flanges, fittings, valves and special alloys.
Your documentation package
EN 10204 3.1 certificate per heat, linked to the delivery note of each shipment.
Lead times and urgent orders
Our own warehouse and a network of manufacturers, for special alloys too. If the project is urgent, let us know when you request the quotation.
Where our material is used in an engineering project
Process skids and modules

CIP/SIP cleaning units

Plant utility pipework

Plant extensions and refurbishments

Turnkey projects

What does your process need?
Before you ask for a quote, we talk through your process: fluid, temperature, pressure and the applicable standards…
Sometimes the right item is not the one you were looking for.








